Projects in progress
|
|
Automatic underground parking lot, Copenhagen
|
Client: |
Department for Technical and Environmental Services of the Municipality of Copenhagen. |
|
Country: |
Denmark |
|
Period: |
2008-2010 |
|
Pihl Services: |
Turnkey contractor |
Building of three underground structures for fully automatic car parks in Copenhagen. The project is carried out as a turnkey contract. The structures are established in a densely populated residential area, which poses a challenge in respect of space and logistics. The contract also includes installations and operation for a five-year period after completion.
|
|
Wastewater Disposal Systems for Ratmalana/Moratuwa and Ja-Ela/Ekala Areas
|
Client: |
National Water Supply and Drainage Board |
|
Country: |
Sri Lanka |
|
Period: |
2007-2011 |
|
Pihl Services: |
Turnkey contractor and partner in the JV Pihl/Läckeby-Purac |
Design and construction of two waster water disposal plants near the capital of Sri Lanka, Colombo. The works comprise installation of pipe network, civil and building works and mechanical and electrical works. The project also includes training of personnel. The project will be constructed by subcontractors under the supervision of JV Pihl/Läckeby-Purac.
|
|
Sisimiut Hydro Power Station, Sisimiut, Greenland
|
Client: |
Nukissiorfiit |
|
Country: |
Greenland |
|
Period: |
2007-2010 |
|
Pihl Services: |
Turnkey contractor |
14 MW hydro powerplant with a 26-km long transmissin line for the supply of lighting, power and heating to the town of Sisimiut.
|
|
Aberdeen City Council 3Rs Schools Project - PPP, Scotland
|
Client: |
Aberdeen City Council |
|
Country: |
Scotland |
|
Period: |
2007-2009 |
|
Pihl Services: |
Turnkey contractor |
The role of E. Pihl & Søn A.S. in NYOP SPV is that of a Design & Build Contractor (turnkey contractor). The project involves construction of seven new primary schools, two new secondary schools, renovation of one primary school and renovation of a sports centre. The total floor area of 67,600 m² is distributed over the eight primary schools of 2.900 m² to 5.900 m², two schools (seventh to tenth classes) of 18,900 m²/13,100 m² respectively. The project also includes the refurbishment of a sports centre of 3,600 m².
|
|
Museum of Liverpool
|
Client: |
The Board of Trustees of National Museums and Galleries on Merseyside |
|
Country: |
England |
|
Period: |
2007-2009 |
|
Pihl Services: |
Joint Venture with Galliford Try |
Reinforced concrete foundation executed as a basement construction. Complex steel structures as cantilever at both ends. Facades of Jura natural stones placed partly on steel frames and partly on pre-manufactured concrete elements. Apart from traditional inside works, the following types of work are also to be carried out: a very long concrete winding stairway, large glass sections in gable ends as well as paving with granite in a large outdoor area. The project also includes electrical and mechanical works.
|
|
Alutrint dock and storage yard, Port of Brighton, La Brea, Trinidad & Tobago
|
Client: |
National Energy Corporation of Trinidad & Tobago |
|
Country: |
Trinidad & Tobago |
|
Period: |
2007-2009 |
|
Pihl Services: |
Joint Venture partner (50/50) in Pihl-Besix ApS and piling, earth and concrete works in own production |
Design of quay and storage yard. Earthworks consist of excavation of about 280,000 m³ soil of which 80% is expected reused for end-user's new storage and office areas.
Construction of dike, protected by stones, begins from land until new quay. Pile wall will be constructed by a combination of HZ and AZ profiles. Concurrently with sheet piling, executed from the landside, the new area will be filled with the excavated material. Subsequent concrete works, totally about 2.600 m³, will commence at the quay incl. depth compacting, etc. The piles will be driven down to about 25 m. Deepening of the port down to 12.8 m will be initiated upon completion of the piling. The water depths vary from 2 to 4 m at the time of start up of the project. Completed areas are to be compacted and geo-textile and gravel will be placed. Finally, various ladders, bollards and fenders will be installed on the quay and the project can be considered completed.
|
|
New domicile for the Carl Aller Etablissement A/S
|
Client: |
CAE |
|
Country: |
Denmark |
|
Period: |
2007-2009 |
|
Pihl Services: |
Turnkey contractor. Carcass and granite facades as own production. |
On 15 June 2009 the new domicile of the Carl Aller Etablissement will be adorning the northern part of Havneholmen in Copenhagen. PIHL has as a turnkey contractor been entrusted with this challenging project. The architects behind the new building are PLH Arkitekter and the building forms part of the master plan previously prepared by the architects Wingård Arkitektkontor. Totally 18,000 m² are distributed on nine storeys. Add to this a basement of 10,000 m² The inner atrium is terraced to create a beautiful connection to the quay just as the many glass sections of the building will reflect the sky as well as the water surface inside the building.
|
|
The National Archives
|
Client: |
OPP Pihl Arkivet A/S |
|
Country: |
Denmark |
|
Period: |
2007-2009 |
|
Pihl Services: |
Turnkey contractor |
Construction of buildings for Denmark's new national archives "Rigsarkivet" as a turnkey contract. Mounting of all shelves and equipment is also included.
|
|
Construction of new domicile for SEB Bank and Pension.
|
Client: |
SEB Bank og Pension |
|
Country: |
Denmark |
|
Period: |
2007-2009 |
|
Pihl Services: |
Multi-trade contractor |
Construction of new domicile for SEB Bank and Pension. The domicile consists of a main building, a building to be let out and an underground car park. Pihl carries out the carcass contract.
|
|
Extension of existing quay at Luba Freeport (I), Equatorial Guinea
|
Client: |
Luba Freeport Limited |
|
Country: |
Equatorial Guinea |
|
Period: |
2007-8 |
|
Pihl Services: |
Tunrkey contractor plus all ownproduction |
The project comprises an extension of the existing quay at Luba, Equatorial Guinea, for the client Luba Freeport Ltd. The quay is constructed as a double-anchored sheet pile wall consisting of 325 tons piles and 73 top- and bottom anchors. Fill will amount to 15-20,000 m³ and a little more than 1,900 m³ concrete will be cast. The entire quay must be completed in four and a half months.
|
|
New Stadium, Vejle - corner towers
|
Client: |
Ejendomsselskabet Mølholm A/S |
|
Country: |
Denmark |
|
Period: |
2007-2008 |
|
Pihl Services: |
Main contractor |
Construction of two square tower blocks of six storeys plus basement. The towers are constructed in connection with the construction of the new stadium of Vejle and cover a total area of about 8,000 m².
|
|
Changuinola I Hydropower Project, Panama
|
Client: |
AES Changuinola |
|
Country: |
Panama |
|
Period: |
2006-2011 |
|
Pihl Services: |
Turnkey contractor in a consortium with MT Højgaard and Alstom |
The Project consists of the construction of two hydropower plants on the Changuinola River in the Bocas del Toro Province in Panama. The main power plant is 207 MW and the second plant, which utilizes the ecological flow, is 9.4 MW. The works to be executed are: an access road, asphalt paved, approx. 18 km long incl. two bridges, 60 m and 160 m long respectively. An RCC (Roller Compacted Concrete) dam, approx. 90 metres high, RCC volume approx. 900,000 m³ incl. diversion structure and gated as well as ungated spillways with a total capacity of 8,600 m³/sec. The reservoir capacity is approx. 320 mill. m³. The water intake structure consists of an approx. 4.3 km long concrete-lined tunnel. Wet area of 60 m² with surge facilities. Underground steel penstock and bifurcation. A surface power station equipped with 2 of sets turbines/generators, 103.5 MW each, supplied and installed by Alstom Brazil. Switchyard and sub-station and approx. 10 km transmission line. The second power plant, situated downstream of the dam, is a surface plant equipped with one set turbine/generator of 9.4 MW. Own production: all works except access road and mechanical and electrical works.
|
|
CJV E18 Grimstad - Kristiansand, Norway
|
Client: |
Agder OPS Vegselskab / Statens Vegvesen |
|
Country: |
Norway |
|
Period: |
2006-2009 |
|
Pihl Services: |
Turnkey Contractor |
Construction of a 38 km long road between the towns of Grimstad and Kristiansand in Norway. The project consists of 41 bridges (seven of them are more than 100 m long), 8 tunnels of a total length of 11 km, 19 culverts, etc. 7 million cubic metres of rock are to be blast, excavated and removed. The tunnels are equipped with ventilation and surveillance and warning systems.
|
|
Egholm - privately owned flats in the area of Sluseholmen
|
Client: |
JM Danmark A/S |
|
Country: |
Denmark |
|
Period: |
2006-2009 |
|
Pihl Services: |
Turnkey contractor |
The residential area of ?Egholm? will be built as an island in the new channel town of Sluseholmen. The works comprise 165 privately owned flats in seven storeys. The block consists of two types of dwellings: channel houses (24 units, from 85 to 162 m2) and quay houses (141, from 66 to 126 m2). There will be parking facilities in the basement under the block.
|
|
Copenhagen Zoo - New Elephant House
|
Client: |
The Society of Zoo's Animal Foundation |
|
Country: |
Denmark |
|
Period: |
2006-2008 |
|
Pihl Services: |
Main contractor and the following works as own production: concrete works, approx. 5,500 m² red/brown concrete with special structure and elements. |
Copenhagen Zoo. Construction of an elephant house of about 3,000 m² with outdoor grounds (about 10,000 m²) for the male elephants and the flock of elephants respectively. The elephant house is situated between the existing elephant house and Frederiksberg Gardens and is in part to be dug down into the terrain.
|
|
KCT 5.1 B, Kingston, Jamaica
|
Client: |
TME Port Authority |
|
Country: |
Jamaica |
|
Period: |
2006-2008 |
|
Pihl Services: |
Main contractor |
Construction of 482 m new sheet pile quay. paving of quay area with concrete blocks, laying of 607 m crane rails. Water supply, drainage, electrical works.
|
|
K5 Jetty Extension, Equatorial Guinea
|
Client: |
Balcova Holding N.V. |
|
Country: |
Equatorial Guinea |
|
Period: |
2006-2007 |
|
Pihl Services: |
Turnkey Contractor |
Extension of existing quay with 570 m sheet pile quay. Fill behind quay 260,000 m³ sand.
|
|
Airport at Paamiut (Frederikshaab)
|
Client: |
Greenland Home Rule, the Directorate for Housing and Infrastructure |
|
Country: |
Greenland |
|
Period: |
2006-2007 |
|
Pihl Services: |
Main contractor |
A runway and a two-storey building accommodating terminal and garage of about 950 m² are to be constructed in Paamiut (Frederikshaab). Electrical works, e.g. runway lighting, PAPI, etc. are included in the contract. Main figures and quantities for the civil engineering works: 70 x 859 m runway with safety zones 15,000 m² roller conveyor and terminal 340,000 m³ blasting 450,000 m³ paving with gravel aggregates 38,000 m³ asphalt paving
|
|
Askholm II, Sluseholmen, Copenhagen
|
Client: |
JM Danmark A/S |
|
Country: |
Denmark |
|
Period: |
2005-2006 |
|
Pihl Services: |
Turnkey Contractor |
The residential area of "Askholm" will be built as an island in the new channel town of Sluseholmen. The works comprise 70 privately owned flats constructed in seven storeys. The block consists of two types of dwellings: channel houses (24 units) and quay houses (46 units). The channel houses are independent estates, which are narrow and cosy. Each building consists of two separate dwellings; each of them has two storeys. The lower dwellings have their own boat and bathing jetty and their own atrium towards the yard. The upper dwellings have their own roof terrace. The quay houses are erected near the pier towards the north and the south and will have up to seven storeys. There will be parking facilities in the basement under the block. All apartments in the quay houses have their own terrace or balcony/roof terrace. The rest of the dwellings will be let.
|
|
Malmø City Tunnel
|
Client: |
Banverket, Citytunnelprojektet |
|
Country: |
Sweden |
|
Period: |
2005-2010 |
|
Pihl Services: |
Turnkey contractor in consortium with Bilfinger Berger AG and Aasleff |
The contract includes establishment of 4,650 m drilled double tunnel with a diameter of 8.95 m. A 700 m long downward car loading platform at Holma and a big underground area for the future station of Trianglen are also established. The area is established 25 m below ground level and will have a length of 280 m, a width of 28 m and a height of 12 m.
|
|
Northern Coastal Highway Improvement Project - Segment 3, Jamaica
|
Client: |
The Permanent Secretary, Ministry of Transport and Works |
|
Country: |
Jamaica |
|
Period: |
2005-2008 |
|
Pihl Services: |
Main contractor |
Improvement / reconstruction of 100 km of Northern Coastal Highway from Ocho Rios to Port Antonio, Jamaica. On 30 km of the road base improvement has been carried out whilst on the remaining 70 km complete reconstruction of the road has been performed, either on existing alignment or on new alignment. In urban areas, and where required, kerbs and gutters are constructed instead of shoulders. Numerous curve widenings, bus turnouts and right turn lanes have been constructed to alleviate congestion. The new pavement consists of hot-mix asphalt concrete layer upon a new base or improved base. Construction of 8 new bridge structures and rehabilitation and repair of further 21 bridges. All existing pipe and box culverts replaced or improved total 130 box culverts and 422 pipe culverts, along with all traffic control devices and informational signs.
View in Google Maps™
|
|
Vejleåparken, Ishøj, phase 3
|
Client: |
Arbejdernes Andelsboligforening – Afdeling 55 |
|
Country: |
Denmark |
|
Period: |
2005 - 2008 |
|
Pihl Services: |
Main contractor |
The renovation works include replacement of roofs, mounting of new facades on existing concrete elements, replacement of windows and doors, replacement of perimeter drains and drains around the buildings and renovation of lavatories and bathrooms. A new floor will be added on four of the blocks to accommodate new two-room penthouses. A number of the single-room flats will be changed into flats of two rooms divided on two floors. Lifts will be installed in the staircase area. The renovation project comprises 13 blocks of dwellings constituting a total of 347 flats. All flats will be inhabited during the entire renovation period. Pihl holds the option for executing similar works in the fourth phase of the project.
|
|
Care centre “Kærbo”, Ishøj
|
Client: |
The municipality of Ishøj |
|
Country: |
Denmark |
|
Period: |
2005-2008 |
|
Pihl Services: |
Turnkey Contractor |
The care centre will be extended by two new blocks with 52 dwellings in three storeys with basement. The total area is 4,800 m². The works also include establishing of a healthcare centre and renovation and refurbishing of existing buildings. Access roads, parking lot and paths are rearranged.
|
|
Renovation of Copenhagen Central Station
|
Client: |
DSB Sale |
|
Country: |
Denmark |
|
Period: |
2005-2008 |
|
Pihl Services: |
Main contractor in joint venture with Per Aarsleff, Petri & Haugsted, Vicotec. Own production within the joint venture: earthworks, paving, concrete, traction current and installation. |
The renovation includes lowering of platforms, extension of platforms, box girder and apron bridges. Two of the existing platforms of a length of approx. 475 m will be lowered by 14 to 20 cm. Further, two platforms are extended by 55 and 70 cm respectively. The work of reinforcing the box girder will primarily be carried out from underneath. The project also includes renovation of the apron bridge and the bridge parallel with the street, traction current plant and various reconstruction works.
|
|
University Center, Ilimmarfik, Nuuk
|
Client: |
The Greenland Home Rule |
|
Country: |
Greenland |
|
Period: |
2005-2007 |
|
Pihl Services: |
Multi-trade contractor |
The works are carried out under the following contracts comprising all works for full completion. 1.1. Arrangement: The project of the tender consists of the first phase of construction and establishment of Ilimmarfik and consists of a two-storey building with an inserted deck to accommodate main entrance, administration, library, canteen, archives and storage rooms. Also included in the project are two four-storey blocks primarily to be used for educational purposes connected by a continuous panoptic room. 1.2 Area: The University Park is built in an area called Siaqqineq North, situated to the northwest of the present Institute for Natural Sciences close to recreational areas. The construction area, having a slight inclination towards the northwest, is easily asseccible and close to the road leading to the airport.
|
|
Highway by-pass "Motorring 3"
|
Client: |
The Danish Road Directorate |
|
Country: |
Denmark |
|
Period: |
2004-2008 |
|
Pihl Services: |
Main contractor in a consortium with Hoffmann A/S |
The contract works form part of the extension of the highway by-pass of Motorring 3 (M3) from 4 to 6 lanes between Jægersborg and the Holbæk highway (M11). This contract forms part of totally four planned main contracts on Motorring 3. The contract works include earthworks, drainage and paving works, bridges, support walls, noise barriers, lighting, marking and traffic signs.
|
|
Psychiatric Hospital, Hillerød, Denmark
|
Client: |
County of Frederiksborg, properties administration |
|
Country: |
Denmark |
|
Period: |
2004-2007 |
|
Pihl Services: |
Turnkey contractor in partnering |
Reconstruction of psychiatric hospital in Hillerød. The works include arrangement of general psychiatric ward, gerontological ward, monitored general psychiatric ward and a special ward for child and juvenile psychiatry.
|
|
Hydropower Plant, Qorlortorsuaq
|
Client: |
Nukissiorfiit |
|
Country: |
Greenland |
|
Period: |
2003-2007 |
|
Pihl Services: |
Turnkey Contractor in joint venture with YIT A/S, Landsvirkjun |
Construction of a hydroelectric power station to supply the villages of Qaqortoq and Narsaq. The power station will use the run-off from the area around the lake Qorlortorsuuq Tasiaq, which is located at approx. level 121. The reservoir is established in part by draining the lake and in part by a small damming to level 124.
|
|
Reconcstruction of Wharves at Malindi Port
|
Client: |
National Authorizing Officer for EDF/Ministry of Finance |
|
Country: |
Tanzania |
|
Period: |
2005-2008 |
|
Pihl Services: |
Turnkey contractor |
The project involves a complete removal of the existing quay wall structures built in 1990 in the centre of Zanzibar Town, Stone Town. Cope of existing wharfs is approx. 400 m and water depth in front varies from 7 to 11 m. The port is presently handling approx. 90% of all traffic in and out of Zanzibar Island including a large number of passenger ferries. Main scope is: design and construction of sheet pile wall, deck and piles must be taken down and removed (deck 9,200 m2, piles 543 pcs.), casting of edge beam on top of the piles (400 m), backfill with sand (70,000 m3) and paving of the area with concrete blocks (10,000 m2). Dredging of approx. 25,000 m3 for the relocated ferry basin.
|
|